Household decorates quality to check and accept a standard


8.12 stone material, wall answers its norms, color to undertake checking before floor tile construction, the wall answers its norms, color to undertake checking before floor tile construction, wall floor tile reduces blame whole brick as far as possible, and use place is appropriate, when having prominence system, should undertake covering cutting by the regulation.

The appropriate before shop of 8.13 stone material is stuck makes processing back a surname, reduce phenomenon of ” of “ water be soiled to happen, spread Tie Yingping to rectify firm, juncture flat, without askew, without corrupt accumulate and oar mark, surface is clean, color is harmonious.

Towel of shop of 8.14 walls floor tile should level off is firm, design clarity, without corrupt accumulate and oar mark, exterior colour and lustre agrees basically, juncture is even, board piece flawless, drop horn and edge damage, strike of air of horn of edge of single block board must not exceed 5% quantitative.

The building area that 8.15 have waterproof demand (use the toilet bath, the kitchen) waterproof layer should be done below facing, waterproof layer all around with the wall the contact is in, answer to break up up, tower above ground not less than 250 millimeter, slope of ground facing running water to floor drain, do not pour flashing, not seeper, experiment of 24 hours of store water does not have leakage.

8.2 woodiness floor

The material of floor of building of 8.21 wood ability qualitative, construction and the requirement that spell beautiful design to should accord with a design. The moisture content of lumber should not is more than 12% .

The laid direction of floor of 8.22 form wood, can seek the opinion of the user, direct motion of appropriate of general corridor, corridor walks along directional laid, indoor room appropriate down radial laid. The gap of 10 millimeter should leave between wooden floor and wall, use kick limb board close over.

8.23 wood ability board facing must spread clench solid to not have become loose, stick receive firm without empty beat, exterior dig plane abrasion is smooth, wait for blemish without stubble of apparent dig mark, prop and burr.

8.24 board facing, board clearance is basic and close, contact position is stagger; Juncture of facing of board spelling a flower is right neat, stick, the hammer is close. Flawless, warp, the surface is clean without clear off color.

8.25 woodiness play rigor of crural line juncture, the surface is slick, height, ply giving a wall is consistent.

8.3 plastic floors

8.31 shops are stuck plastic board the adhesive that facing uses, answer to pledge according to basic level material knead dough layer uses a requirement to choose. Basic level must level off, hard, dry without grease. Facing should level off, smooth, without interstitial, colour and lustre even, thickness agrees, the brim is flat, there must not be sundry and amiable bubble inside facing.